275

Granada FU

Choose format:

NF DF

Try joint colour:

275

275

Processing:

Front face configuration

Front face configuration Front face configuration (FFC) only uses the front faces of the clinker bricks. This gives the façade a calmer and more uniform appearance than that of mixed face configuration (MFC).

Mixed face configuration

Mixed face configuration Mixed face configuration (MFC) uses both the front and reverse faces of the clinker bricks. This gives the façade a more vibrant appearance than when only the front faces are used. Given that mixed face configuration allows two brick slips to be obtained from one clinker brick, mixed face configuration is more attractive in terms of pricing.

Granada FU

in zwei Rot-Nuancen brennender Ton | rustikale Kantenausprägung | partiell besandete Oberfläche

Format DF - Thin format (240x15x52 mm)
Availability Property-specific range
Brick bond Random bond
Material requirement ca. 64 Unit/m²
Pallet content 2880 Units per pallet
Useful tools for your project

Different format versions for this clinker brick